Page 156 - UNESCO_Zatec_MP_2021
P. 156
D.2.6.2. – C SWOT C.1.B/6 - SWOT C.2.B/16 - SWOT C.2.B/15 - SWOT C.2.C/17
PEDESTRIAN CONNECTION AND COMPONENT PARTS AVAILABILITY COMPONENT PARTS 01 A 02
D. PROPOSAL SECTION OF THE MANAGEMENT PLAN
Route1: Žatec-Bezděkov-Trnovany- Stekník-Drahomyšl
Tracing, road restoration, signage, the addition of map signboards and rest areas, information on local destinations, QR codes.
Participants:
Short Term Measures
The town of Žatec, The Municipality of Zálužice, Czech Tourists Club, NHI- Stekník Chateau,
2021-2022
Ústecký Region
D.2.6.2. – D SWOT C.1.B/6 - SWOT C.2.B/16 - SWOT C.2.B/15 - SWOT C.2.C/17
PEDESTRIAN CONNECTION AND COMPONENT PARTS AVAILABILITY COMPONENT PARTS 01 A 02
Route1: Žatec-Tvršice - Stekník (turnoff to Staňkovice)
Tracing, road restoration, signage, the addition of map signboards and rest areas, information on local destinations, QR codes.
Solve including connection to the system of existing walking routes by the river Ohře. Solve, including the connection to the system
of existing cycling routes by the river Ohře.
Participants:
Short Term Measures
The town of Žatec, The Municipality of Zálužice, Czech Tourists Club, Stekník Chateau, Ústecký
2021-2022
Region
OVERVIEW OF PLANNED ACTIVITIES IN COMPONENT PART 02
Guarantor:
The town of Žatec
156
Expected Cooperation:
Ministry of Transport of the Czech Republic, Ústecký Region
Footbridge over Nákladní Street.
The aim is to increase the ease of access to the area for pedestrians and cyclists, who can reach the Žatec Urban Heritage Reserve
from residential districts in the south of the town, only through the Prague Suburbs. However, the route has to cross the relatively
busy Nákladní Street. It would be possible to bridge this road using a footbridge for pedestrians and cyclists (inspired by the student
works of Faculty of Architecture). The footbridge would go from the area of the Municipal Theatre towards Nerudovo Square.
The proposed location of the footbridge is part of the terrestrial study (ing. Arch. Krolák, 2019), which will be incorporated into the
change of the Spatial Plan in 2021.
Footbridge over Pod Střelnicí Street
It would be possible to consider a similar footbridge between the area behind the bus terminal and the park adjoining Tyršova Street
on the opposite side. Its location must be based on the concept of the revitalisation of parks around the perimeter of the Urban
Heritage Reserve.
The proposed location of the footbridge is part of the terrestrial study (ing. Arch. Krolák, 2019), which will be incorporated into the
change of the Spatial Plan in 2021.
Extension of pedestrian areas in Obránců míru Street - pedestrian zone
In the section between Svobody Square and Komerční banka (Commercial Bank). This Measures must be conceptually connected
with the overall solution to the space of the historical core, which should result from an architectural-urbanistic competition under
consideration.
The presupposition is in the widening of pavements and narrowing of roads (one-way traffic system).